Site C dam project design has been changed to eliminate a separate bridge across the Peace River

Permits approved for Site C hydro dam

BC Hydro negotiating compensation with aboriginal communities, B.C. cabinet to decide soon whether $8 billion project will go ahead

VICTORIA – Both the federal and provincial governments have issued environmental assessment certificates for BC Hydro’s Site C dam, the proposed third hydroelectric project on the Peace River in northeastern B.C.

The approvals include dozens of legally binding conditions, including a $20 million farmland enhancement fund to offset river bottom land that would be flooded, and compensation for local aboriginal groups whose historic treaty rights to hunting, fishing and trapping would be affected.

Cost of the project, last estimated by BC Hydro at $7.9 billion, will factor into a final decision by the B.C. cabinet whether to go ahead with the dam. Energy Minister Bill Bennett has indicated he expects the final investment decision to be made by the end of 2014, and if it’s approved, work would begin immediately.

Among the 77 B.C. conditions is an aboriginal business participation strategy to share the estimated 10,000 person-years of construction work the dam project would generate.

Seven aboriginal communities affected by the proposal have been offered cash and Crown land to compensate for land lost by construction of the dam. All are signatories to Treaty 8, which ensures their rights to hunt, trap and fish as they did before the treaty was signed in 1899. Officials say five of the seven are currently in negotiations.

Situated near Fort St. John and downstream of the W.A.C. Bennett and Peace Canyon dams, Site C’s 1,050-metre-long earthfill dam would create a reservoir 83 km long and two to three times the current width of the river.

It requires two power lines built in the same corridor as the existing line, and six water turbine generators that would produce enough electricity to power about 450,000 homes.

BC Hydro estimates that because Site C would use water held back in the existing Williston Lake reservoir, it would generate 35 per cent of the energy as the Bennett dam with only five per cent of the reservoir area.

 

Just Posted

City of Castlegar treating weeds the next few weeks

City will be using organic product on sidewalks, traffic islands and parking lots.

17th Street closed intermittently today

Castlegar street will be closed for line painting

Summer reading fun at Castlegar library

Registration for second session in July 19.

Last stop: The inside story of Queen City Shuttle and Charters’ closure

Former employees open up about the Nelson company’s final days

Craft cannabis development planned for Castlegar

Plans are underway for one of the first craft cannabis industrial parks in the province.

Feds lowered poverty line, reducing the number of seniors in need: documents

Liberals introduced a poverty line that was below the prior low-income cutoff

“Does Kirby care?” B.C. First Nation’s group using geo-targeted ads in Houston, Texas for justice

The Heiltsuk Tribal Council has called out Kirby Corporation for the Nathan E. Stewart oil spill

Trudeau announces $79M investment for 118 more public transit buses across B.C.

Contributions from municipal to federal level to fund more buses in a bid to cut commutes

B.C. woman wins record $2.1 million on casino slot machine

‘That night was so surreal … I wasn’t able to sleep or eat for the first two days,’ she said

West Kootenay U16 Rebels take home provincial gold

West Kootenay Rebels fastball team battle hard to win the BC U16C Fastball Championship

After B.C. dad’s death, Technical Safety BC wants changes to trampoline park rules

Jay Greenwood, 46, did ‘a series of acrobatic manoeuvres prior to a fall that caused serious injury and cardiac arrest’

$900M settlement reached in class action on sexual misconduct in Canadian military

After facing criticism, the government moved to begin settlement proceedings in early 2018

Tax take stays ahead of increased B.C. government spending

Tax revenue $2.1 billion higher than budget in 2018-19

Two toddler siblings found drowned on First Nation in Alberta

The siblings were found drowned on their family’s property, according to RCMP

Most Read